This morning when I got into work Krista and I got the finale drop up and off the floor. Some of the carpenters came in, rolled it up, and took it away to be loaded on stage. The rest of my morning was helping Emily align different lettering that needed to be pounced on to the smaller drops. The whole group then had lunch and we couldn’t go outside and walk because there was a torrential down pour all day.
After lunch Emily and I finished pouncing the two drops with all of their lettering components. After that was finished we both started inking the drops with sharpie. You cannot make mistakes in the instance so needless to say I was quite nervous. Emily was pulled away to start helping someone else with another project and I was left all by myself. I got even more nervous then but there was nothing I could do about it so I just kept inking the drop I was working on. Later Phyllis came over and started inking the second lettered drop.
Now I am home and trying to finish more job applications.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment